Engineering Sciences Lab (ESL) Infrastructure Renewal Project

The University’s School of Engineering and Applied Sciences began an eight-month infrastructure renewal project at the Engineering Sciences Lab (ESL) located at 58 Oxford Street in April 2022. The project included a building-wide upgrade of the electrical and HVAC systems to address interruptions in service and replace aging equipment that has impacted research operations. Project activities were largely contained to the interior of the building. The project was completed in Spring 2023.