Please note: Due to the COVID-19 pandemic, the City of Cambridge issued a directive on March 19, 2020 calling for the suspension of all construction activity in the city by close of business, Saturday, March 21, until further notice.

Lewis International Law Center (Lewis Hall) is currently undergoing a major renovation that includes:

  • Complete replacement of all mechanical, HVAC, electrical, plumbing, and fire protection systems.
  • Updating the building’s exterior finishes, including replacing all windows, and modernizing the building’s interior, including floors, walls, and ceilings.
  • Bumping out the building by 20 feet on the 2nd, 3rd and 4th floors on the side of the building facing Mass Ave.
  • Addition of a 5th floor.

 

Project Duration: June 2019 – July 2021

Design Team: Deborah Berke Partners

Construction Manager: Shawmut Design and Construction

Lewis Hall Lot Closure - Alternative Pick Up Locations:

For cabs, Ubers and others looking for a street address during Lewis Hall construction, one option is 1607 Mass Ave - the new building just across Everett Street. The address is clearly visible and there is a small overhang to stand during inclement weather.

An alternative location is 10 Everett Street - the WCC Clinical Wing entrance. Please keep in mind that the lobby may not always be open so there may be no place to get out of the weather. This location might be the best option for those heading towards Harvard Square or traveling south.

For regular drop off or pick up where the street address is not essential, drive in off of Oxford Street at the Maxwell Dworkin building. You can drive through the parking area past Hauser, along the far side of Holmes Field all the way around to Langdell south and Austin Hall.