Public Way Impacts
- Harvard/Cambridge Police details will be posted at each intersection of Bow Street, Linden Street and Plympton Street.
- Bow Street will remain closed in front of Randolph Hall from Linden to Plympton Street.
- Linden Street will periodically be blocked to vehicle traffic for dumpster swaps, deliveries, and to move machinery.
- A site fence has been installed, including lighting and signage.
- Dumpster swaps will continue at the north end of Plympton Street, Bow Street, and the courtyard.
- Continuous deliveries will happen at Linden, Plympton, and Bow Streets.
Exterior Site Activities
- Utility work will continue to take place in the courtyard.
- Work on a sewer line within the site fence is ongoing on Plympton Street.
- Masonry work is ongoing.
- Work activities on the wall foundations and stairs will continue to occur in the courtyard.
- Installation of balconies on Linden Street continues.
- Work on the courtyard foundation will occur.
Interior Site Activities
- Spray insulation is ongoing on the ground floor and in the basement.
- Taping, plastering, and finishing will continue on the 1st and 2nd floors.
- Tile will continue to be installed on the 1st and 2nd floor.
- Wood flooring continues to be installed on the 2nd floor.
- Installation of trim on the 2nd floor is ongoing.
- Stairs will continue to be restored and installed.
- Elevator installation is ongoing.
- Installation of risers for electrical, plumbing, mechanical, and fire protection will continue, as well as overhead rough-ins.