The following summarizes the work planned on the Eliot and Kirkland Exploratory Summer 2024 Project. Please note that items in BOLD are expected to generate some noticeable noise.
PUBLIC WAY IMPACTS:
- Drilling of borings at South Street will occur. Traffic flow will be maintained
- Fencing will be erected at the bike racks and trees at Eliot House entrance for small excavation areas to probe the tunnel roof.
EXTERIOR SITE ACTIVITIES:
- Excavation of test pits will occur in the Eliot Courtyard.
- Pile load tests will take place at the test pits in the Eliot Courtyard.
- Recharging of groundwater is ongoing at the MAC Quad.
- Roof probes will occur on Kirkland House/
INTERIOR ACTIVITIES:
- Access panels will be installed in Kirkland House.
- Patching will occur on the ceilings in Levels 1 and 3 in Hicks House.
- Coring of slabs will take place in the Eliot Basement.
WORK HOURS:
- Monday to Friday: 7am to 3:30pm.