175 North Harvard Street Project Construction Impacts Update
The following is an overview of the work taking place at the 175 North Harvard construction site at the
future location of the new Harvard University affiliate housing building and American Repertory Theatre
(ART):
- The structural steel phase of the housing project is ongoing rising out of the ground this month.
Decking will follow through December. Steel beams are being delivered on flat-bed trucks and will
be offloaded and installed using the tower crane. Concrete decking and detailing will be taking
place through this month. Mechanical, electrical, and plumbing trades are on site working on
under slab utilities. Rebar installation begins this week and concrete pouring is planned to start
the following week. - Please note stud welders are on site now and their use will create some perceptible noise.
- The tower crane will be in use into next year during normal working hours and will be placed in
weathervane mode with safety lighting turned inward at the end of every shift. - Wheel washing and street sweeping continues to ensure soil is not being tracked through the
neighborhood streets. - There are no planned road closures on South Campus Drive this week. Only construction vehicles
are permitted to turn onto South Campus Drive from North Harvard Street for safety reasons and
to improve traffic flow. All other vehicles are directed to access South Campus Drive from Western
Ave. - On the new American Repertory Theater (ART) work site, crews are excavating for the final
sequence of foundation and backfill. This foundation work will continue through August. Concrete
and rebar work will continue through August. Backfilling is ongoing in the substage area.
Formwork and waterproofing will be ongoing and tie-ins for the mat slab work are starting. - Building mock-ups to review design and constructability are underway across North Harvard
Street. The curtain wall for the mock-up will be delivered in late August/early September. - The affiliate housing building crew will be working on site this Saturday, August 17, to progress
with structural steel and decking work. - The project’s regular work hours are Monday through Friday, 7:00 a.m. and 6:00 p.m. and
Saturdays as permitted by the City of Boston from 7:00 a.m. to 6:00 p.m.