The following summarizes the utility work planned in the Littauer Lot for the week of May 5. Please note that items in BOLD are expected to generate some noticeable noise

Dates: 5/5/25-5/9/25
 
PUBLIC WAY IMPACTS:

  • Work zones will be coned off at the manhole located outside of Austin Hall to allow work inside the manhole.

EXTERIOR SITE ACTIVITIES:

  • McDonald Electric will be working inside the manhole located outside of Austin Hall installing equipment and wiring. There will be minimal noise impacts from this operation.
  • Fence and materials within the laydown yard inside Littauer lot will be relocated. There will be minimal noise impacts from this operation.

OTHER IMPACTS:

  • No other impacts are expected.

WORK HOURS:

  • Monday-Friday 7:00 AM to 3:30 PM.  
  • No plan to work Saturday, May 10 at this time.