The following summarizes the work planned at Eliot House during the week beginning Tuesday, May 27:
PUBLIC WAY IMPACTS:
- The contractor will be lining and striping a new temporary pedestrian crosswalk on Memorial Drive.
- Traffic light poles will be installed at the new pedestrian crosswalk.
EXTERIOR SITE ACTIVITIES:
- Trenching will take place using a mini excavator and air spade from the Winthrop House foundation to the temporary pedestrian crosswalk. This work will generate some noticeable noise.
- The contractor will be coring a 4” hole through the Winthrop house foundation to provide power for the temporary crosswalk. This work is also expected to generate some noticeable noise.
- Masons will be on site documenting Eliot House archway conditions and labeling each stone piece using a scissor
INTERIOR ACTIVITIES
- None
WORK HOURS
- Tuesday-Friday 7:00am -3:30pm.