Week of September 15, 2025

The following summarizes the work planned at Eliot House during the week beginning Monday, September 15, 2025:​​​​​

Dates: 09/15/25 – 09/20/25

PUBLIC WAY IMPACTS:

  • Dumpster Swaps (5x a day) from Dunster Circle for the connector building demolition beginning Thursday 9/18/25. A laborer and HUPD will be staged in the crosswalk in front of Kirkland to help with pedestrian traffic.

EXTERIOR SITE ACTIVITIES:

  • Demo of masonry banding around building.
  • Exterior washing of masonry façade.
  • Scaffold installation on the North building and chimneys in the SW.
  • Demo / abatement of north building roof.
  • Continuous daily dumpster swaps during first shift.
  • Connector Demolition at Dunster St.

INTERIOR ACTIVITIES:

  • Saw cutting basement labs.
  • Drilling piles in basement.
  • Demolition using lulls / trash chutes.

Weekend Activities:

  • 09/13/25
    • Demo / abatement of southwest building roof.
    • Demo / abatement Eliot House.
    • Setting Control L5.

WORK HOURS:

  • Monday- Friday 7am-11pm (Two Shifts).
  • Saturday 9am-5pm.