Week of December 22, 2025

Dates: 12/22/25-12/26/25
 
KIRKLAND HOUSE IMPACTS:

  • Dunster Street: The site contractor will continue with mass excavation and hauling out material.
  • Dunster Street: Police details have been scheduled to assist with pedestrian safety and vehicular traffic.
  • Noisy Work: The site contractor will continue the drilled pile operation at the connector between Eliot and Kirkland.
  • Noisy Work: Eliot House interior demolition Monday – Friday (7:00 am – 3:00 pm).
  • Noisy Work: Eliot House façade restoration which includes masonry and roofing demolition.

PUBLIC WAY IMPACTS:

  • State Police detail and HUPD detail called Monday-Friday to assist with construction vehicles entering and exiting into public roads.
  • Continuous deliveries off Memorial Drive into the courtyard.

EXTERIOR SITE ACTIVITIES:

  • Demolition of masonry banding around building.
  • Exterior washing of masonry façade – Southeast Building.
  • Scaffold installation on the chimneys in the north.
  • Demolition / abatement of Southeast roof.
  • Continuous daily dumpster swaps off Memorial Drive.
  • Demolition of chimneys on the North Building.
  • Mass excavation in Dunster Circle.
  • Site prep and drilled piles installation at the connector building.
  • Scaffold dismantle on the chimneys on the southwest roof.

INTERIOR ACTIVITIES:

  • Saw cutting basement slabs.
  • Drilling piles in the Basement.
  • Demolition using lulls / trash chutes.
  • Removal of sub grade basement soils.
  • MEP Coring through slabs.
  • Super cap placement in the north building.
  • Framing and boarding in the southwest building.
  • Spray foam insulation in the southwest building.

WORK HOURS:

  • Monday-Wednesday, Friday 7:00 am-6:00 pm.
  • Site is closed on Thursday, December 25 for Christmas.
  • Saturday, December 27 the site is closed.