Dates: 12/22/25-12/26/25
KIRKLAND HOUSE IMPACTS:
- Dunster Street: The site contractor will continue with mass excavation and hauling out material.
- Dunster Street: Police details have been scheduled to assist with pedestrian safety and vehicular traffic.
- Noisy Work: The site contractor will continue the drilled pile operation at the connector between Eliot and Kirkland.
- Noisy Work: Eliot House interior demolition Monday – Friday (7:00 am – 3:00 pm).
- Noisy Work: Eliot House façade restoration which includes masonry and roofing demolition.
PUBLIC WAY IMPACTS:
- State Police detail and HUPD detail called Monday-Friday to assist with construction vehicles entering and exiting into public roads.
- Continuous deliveries off Memorial Drive into the courtyard.
EXTERIOR SITE ACTIVITIES:
- Demolition of masonry banding around building.
- Exterior washing of masonry façade – Southeast Building.
- Scaffold installation on the chimneys in the north.
- Demolition / abatement of Southeast roof.
- Continuous daily dumpster swaps off Memorial Drive.
- Demolition of chimneys on the North Building.
- Mass excavation in Dunster Circle.
- Site prep and drilled piles installation at the connector building.
- Scaffold dismantle on the chimneys on the southwest roof.
INTERIOR ACTIVITIES:
- Saw cutting basement slabs.
- Drilling piles in the Basement.
- Demolition using lulls / trash chutes.
- Removal of sub grade basement soils.
- MEP Coring through slabs.
- Super cap placement in the north building.
- Framing and boarding in the southwest building.
- Spray foam insulation in the southwest building.
WORK HOURS:
- Monday-Wednesday, Friday 7:00 am-6:00 pm.
- Site is closed on Thursday, December 25 for Christmas.
- Saturday, December 27 the site is closed.