Public Way Impacts
- Harvard/Cambridge Police details will be posted at each intersection of Bow Street, Linden Street and Plympton Street.
 - Bow Street will remain closed in front of Randolph Hall from Linden to Plympton Street.
 - Linden Street will periodically be blocked to vehicle traffic for dumpster swaps, deliveries, and to move machinery.
 - A site fence has been installed, including lighting and signage.
 - Dumpster swaps will continue at the north end of Plympton Street, Bow Street, and the courtyard.
 - Continuous deliveries will happen at Linden, Plympton, and Bow Streets.
 
Exterior Site Activities
- Work on the subgrade in the courtyard is ongoing.
 - Balcony supports will be installed on Linden Street.
 - Backfilling and other work activities on the wall foundations and stairs in the courtyard will continue to occur.
 
Interior Site Activities
- Spray insulation is ongoing on the ground floor and in the basement.
 
- Taping, plastering, and finishing will continue on the 1st and 2nd floors.
 - Tile installation is ongoing on the 1st and 2nd floor.
 - Wood flooring continues to be installed on the 2nd floor and 1st floor.
 - Installation of trim on the 1st and 2nd floor is ongoing.
 - Restoration of the stairs will continue.
 - Elevator installation is ongoing.
 - Installation of risers for electrical, plumbing, mechanical, and fire protection will continue, as well as overhead rough-ins.