The following summarizes the work planned on the Adams House Phase 3 renovation for the week of May 6. Please note that items in BOLD are expected to generate some noticeable noise.
PUBLIC WAY IMPACTS:
- Continuous deliveries and dumpster swaps will occur throughout the week.
- Trucking of soils and concrete will continue from Bow Street Gate 2.
EXTERIOR SITE ACTIVITIES:
- Masonry work on the exterior façade will continue. Repointing of stone on the north, south & west elevations of Russell Hall and cutting along the west & south elevation of the library commons, and the north & east elevation of Westmorly is progressing. Above the pool theater, within the Westmorly courtyard, cutting and washing activities will take place.
- Work on the windows will continue on the south and east elevations of Westmorly.
- Masonry rebuild for the Russell Hall chimney’s is ongoing.
- Masonry rebuild of the north façade of Westmorly will continue to occur on the area adjacent to the School of Public Health.
- Stripping continues for the exterior windows of Russell Hall on the south and west elevations.
- Mid-week, a pump truck will be on Bow Street for a concrete placement.
- Man/material hoist will be operating while the site is open.
- On weekdays the lift will operate 7am-3:30pm and on Saturday it will be in operation from 9am-4:30pm.
INTERIOR ACTIVITIES:
- Interior framing and drywall activities will continue to occur in Westmorly.
- Excavations for under slab utilities within Westmorly continues to progress.
- Rebar & concrete work will take place in the Conservatory area.
- Installation of new mechanical systems within Westmorly is ongoing.
- Installation of the elevator shafts within Russell Hall and Westmorly Court will continue.
WORK HOURS:
- Monday to Friday: 7am to 3:30pm
- Saturday, May 11: 9am to 4:30pm