Week of August 1, 2022

Public Way Impacts

  • Harvard/Cambridge Police details will be posted at each intersection of Bow Street, Linden Street and Plympton Street.
  • Bow Street will remain closed in front of Randolph Hall from Linden to Plympton Street.
  • Linden Street and Plympton Street will have a drive lane and both roads will remain open for pedestrians.
  • Linden Street will periodically be blocked to vehicle traffic for dumpster swaps, deliveries, and to move machinery.
  • A site fence has been installed, including lighting and signage.
  • Dumpster swaps will continue at the north end of Plympton Street, Bow Street, and the courtyard.
  • Continuous deliveries will happen at Linden, Plympton, and Bow Streets.
  • The Tower Crane located in the courtyard will be active from 7:00 AM – 3:00 PM daily.

 Exterior Site Activities

  • Work on the dormers will occur on Linden Street and in the courtyard.
  • Façade work will continue.
  • Roof slate and flashing will be installed.
  • Stonework will begin.
  • Dumpster loading with trash chute will continue on Bow Street.
  • Deliveries will be made on Bow Street for load-in of material at southwest gate as well as on Linden Street at the entrance to the Courtyard.

 Interior Site Activities

  • Miscellaneous demo work will go on as needed.
  • Backfilling for the foundation will continue.
  • Fire proofing will take place.
  • Windows will continue to be installed.
  • The 1st and 2nd floor will be taped and plastered.
  • Work on the foundation in the basement will occur.
  • Framing will take place on the 1st floor.
  • Sheetrocking will continue to be installed on the 3rd floor as well as painting.
  • Installation of risers for electrical, plumbing, mechanical, and fire protection will continue, as well as overhead rough-ins.