Week of May 1, 2023

Public Way Impacts

  • Harvard/Cambridge Police details will be posted at each intersection of Bow Street, Linden Street and Plympton Street.
  • Bow Street will remain closed in front of Randolph Hall from Linden to Plympton Street.
  • Linden Street and Plympton Street will periodically be blocked to vehicle traffic for dumpster swaps, deliveries, and to move machinery.
  • A site fence has been installed, including lighting and signage.
  • Dumpster swaps will continue at the north end of Plympton Street, Bow Street, and the courtyard.
  • Continuous deliveries will happen at Linden, Plympton, and Bow Streets.
  • Plympton Street is anticipated to be closed Monday, May 1 through Thursday, May 4 from 7:00 AM – 4:00 PM for window washing. A boom truck will be set up in the street to facilitate this work. The contractor will re-open the street at the end of each workday after 4:00 p.m. When closed, vehicles will be detoured down Mt. Auburn Street to Mass Ave. Vehicles looking to access the parking lots at the top of Plympton Street, including the Crimson and 22 Plympton, will be able to access them from Mass Ave. Pedestrian traffic will not be impacted, and will have full access to the Plympton Street sidewalk.

 Exterior Site Activities

  • Work on the courtyard landscape and hardscape continues to progress.

Interior Site Activities

  • Punch list items continue on the 1st, 2nd, and 3rd floors.