Week of May 15, 2023

Public Way Impacts

  • Harvard/Cambridge Police details will be posted at each intersection of Bow Street, Linden Street and Plympton Street.
  • Bow Street will remain closed in front of Randolph Hall from Linden to Plympton Street.
  • Linden Street and Plympton Street will periodically be blocked to vehicle traffic for dumpster swaps, deliveries, and to move machinery.
  • A site fence has been installed, including lighting and signage.    
  • Dumpster swaps will continue at Bow Street.
  • Continuous deliveries will happen at Linden, Plympton, and Bow Streets.
  • Linden Street will be closed from Monday through Friday 7:00 AM – 4:30 PM for paving operations. Heavy equipment will be positioned in the road to conduct this work.The road will be closed to vehicles and pedestrians (as a through way from Mass Ave to Bow Street) on Monday and Tuesday overnight. Pedestrians will have access to the top of Linden from Mass Ave. On Wednesday through Friday, the street will open up to vehicles after 4:30 pm. Cars will detour down Dunster Street to access Mt. Auburn Street.

 Exterior Site Activities

  • Work on the courtyard landscape continues to progress.
  • Hardscaping work will occur on Linden Street.

Interior Site Activities

  • Punch list items continue on the 1st, 2nd, 3rd and 4th floors.