Week of September 12, 2022

Public Way Impacts

  • Harvard/Cambridge Police details will be posted at each intersection of Bow Street, Linden Street and Plympton Street.
  • Bow Street will remain closed in front of Randolph Hall from Linden to Plympton Street.
  • Linden Street and Plympton Street will have a drive lane and both roads will remain open for pedestrians.
  • Linden Street and Plympton Street will periodically be blocked to vehicle traffic for dumpster swaps, deliveries, and to move machinery.
  • A site fence has been installed, including lighting and signage.
  • Dumpster swaps will continue at the north end of Plympton Street, Bow Street, and the courtyard.
  • Continuous deliveries will happen at Linden, Plympton, and Bow Streets.
  • The Tower Crane located in the courtyard will be active from 7:00 AM – 3:00 PM daily.

 Exterior Site Activities

  • Flashing will be installed in the courtyard, as well as gutters, downspouts, and courtyard balconies.
  • Removal of the scaffolding located in the courtyard will continue with the use of the tower crane.
  • Dumpster loading with trash chute will remain on Bow Street.
  • Deliveries will be made on Bow Street for load-in of material at southwest gate as well as on Linden Street at the entrance to the Courtyard.

 Interior Site Activities

  • Miscellaneous demo work will continue as needed.
  • Work in the basement and on the foundation is ongoing.
  • Window work will continue.
  • Framing will take place on the 1st floor.
  • The installation of the elevators will begin.
  • Sheetrocking will continue to be installed on the 3rd floor.
  • Painting will occur on the 2nd floor.
  • Taping and plastering on the 1st and 2nd floors will continue.
  • Installation of tile, trim, flooring, and vanity tops will occur on the 3rd floor.
  • Installation of risers for electrical, plumbing, mechanical, and fire protection will continue, as well as overhead rough-ins.