Week of October 10, 2022

Public Way Impacts

  • The job site will be closed on Monday 10/10 for the holiday and operations will continue on Tuesday 10/11.
  • Harvard/Cambridge Police details will be posted at each intersection of Bow Street, Linden Street and Plympton Street.
  • Bow Street will remain closed in front of Randolph Hall from Linden to Plympton Street.
  • Plympton Street will have a drive lane and the sidewalk will remain open for pedestrians.
  • Linden Street and Plympton Street will periodically be blocked to vehicle traffic for dumpster swaps, deliveries, and to move machinery.
  • A site fence has been installed, including lighting and signage.
  • Dumpster swaps will continue at the north end of Plympton Street, Bow Street, and the courtyard.
  • Continuous deliveries will happen at Linden, Plympton, and Bow Streets.

 Exterior Site Activities

  • Utility work will continue to take place in the courtyard.
  • Installation of balconies on Plympton Street will occur as well as the installation of the snow fence rails at the roof.
  • Removal of the exterior south elevation staging will begin.
  • Gutters and downspouts will continue to be installed on Bow Street.
  • Mortar washing will continue as well as minor miscellaneous activities on Plympton, Linden, and Bow Street.

 Interior Site Activities

  • Framing will continue to take place on the ground floor and 4th floor.
  • Insulation will occur on the 4th floor.
  • Installation of trim, bathroom vanity tops, and brackets will occur on the 3rd floor.
  • Taping, plastering, and finishing will continue on the 1st and 2nd floors.
  • Tile will be installed on the 2nd floor.
  • Wood flooring will continue to be installed on the 2nd floor.
  • Installation of elevator number 2 will continue.
  • Work in the basement is ongoing.
  • Installation of risers for electrical, plumbing, mechanical, and fire protection will continue, as well as overhead rough-ins.