Public Way Impacts
- Harvard/Cambridge Police details will be posted at each intersection of Bow Street, Linden Street and Plympton Street.
- Bow Street will remain closed in front of Randolph Hall from Linden to Plympton Street.
- Linden Street and Plympton Street will periodically be blocked to vehicle traffic for dumpster swaps, deliveries, and to move machinery.
- A site fence has been installed, including lighting and signage.
- Dumpster swaps will continue at the north end of Plympton Street, Bow Street, and the courtyard.
- Continuous deliveries will happen at Linden, Plympton, and Bow Streets.
Exterior Site Activities
- Work on the subgrade in the courtyard is ongoing.
- The rebuilding of the granite wall in the courtyard is progressing.
- Backfilling the wall foundations and the stairs in the courtyard continues.
- The granite wall adjacent to the steam tunnel continues to be rebuilt.
- Installation of pavers on Plympton Street will continue to take place.
- Underground utilities will continue to be installed within the site fence on Linden Street.
- The installation of the sidewalk curb will occur within the site fence on Bow Street and Plympton Street.
- The installation of the granite curbing along Bow Street is progressing.
Interior Site Activities
- Spray insulation on the ground floor and in the basement continues.
- Taping, plastering, and finishing will continue on the 1st and the 4th floor.
- Tile installation is ongoing on the 1st and 2nd floor.
- Wood flooring continues to be installed on the 2nd and 1st floor.
- Installation of trim on the 1st and 2nd floor will continue.
- Restoration of the stairs will continue to occur.
- Elevator installation is ongoing.
- Installation of risers for electrical, plumbing, mechanical, and fire protection will continue, as well as overhead rough-ins.