Week of January 22, 2024

175 North Harvard Street Project Construction Impacts Update

• Project enabling activities are progressing through January in preparation for building construction.
o Bulk excavation continues with soil removal and the hauling of soil off site taking place for the next few weeks.
o Periodic steel deliveries continue.
o Truck traffic in and out of the site is steady throughout the day during standard work hours.
o Wheel washing and street sweeping continues to ensure soil isn’t being tracked through the streets.
o Temporary electrical infrastructure is being installed for construction power.
o Site dewatering is ongoing.


• Third-party engineers continue to monitor the dust, noise, and vibration monitors that are positioned around the work site to ensure construction activities remain within safe and acceptable levels.


• The project’s regular work hours are Monday through Friday, 7:00 a.m. and 6:00 p.m. Some work on Saturdays may be necessary as permitted by the City of Boston from 7:00 a.m. to 6:00 p.m.